PermitEasy
City of Toronto
2026 Rules

Driveway Permit Guide

Complete guide to driveway permits in Toronto, including fees, requirements, and how to apply.

NO PERMIT NEEDED

Estimated Fee

$0 for paving. $214.79 for Zoning Applicable Law Certificate if widening

When You Need a Permit

Permit Required If:

City right-of-way permit may be needed if modifying boulevard/curb cut

Exempt If:

Paving existing driveway does not require building permit

Fees

$0 for paving. $214.79 for Zoning Applicable Law Certificate if widening

N/A

Minimum fee: $214.79

Processing Time

N/A

Typical processing time

Documents You'll Need
  • 1
    Zoning Applicable Law Certificate application if widening
  • 2
    Right-of-way permit application if modifying curb
Common Gotchas
  • Maximum driveway width restrictions apply
  • Front yard paving limits under zoning by-law
  • Cannot pave over entire front yard
  • Permeable surface requirements may apply
  • Boulevard modifications need city approval
Exemptions
  • Repaving existing driveway
  • No building permit required for driveway paving
Zoning Considerations
  • Maximum driveway width
  • Front yard landscaping requirements
  • Soft landscaping minimums
How to Apply

Toronto Building

416-397-5330

Fee Payment

416-397-5222

Sources
  • City of Toronto
  • Toronto Municipal Code Chapter 743
  • Toronto Zoning By-law 569-2013

Disclaimer: This information is for general guidance only and is not legal advice. Permit requirements may change. Always verify with the City of Toronto Building department before starting work.